Edmiston Towers

Elkins, W. Va,
WDNE-AM
Installation of new AM ground system
New 8
New 7
New 6
New 5
New 4
New 3
New 2
New 1

Memphis, purging new FM system
New 10
New 9

WKNO Memphis, Tn.
660' 4-leg Andrew Tower
Removal of top mount
Ch 10 Batwing

Scan2
Scan3
Scan4
Scan5
Scan6
After removal of top mount TV antenna, we removed 120' of tower
Scan7
Scan8
Scan9
Scan10
Fabricating top section
Scan10h
Scan10c
Scan10d
Scan10e
Scan10f
Scan10g
Scan10h2
Scan10i
After removal of 120' tower refabbed to section to accomodate 70' pylon refabbed top section
Scan11
Scan12
Scan13
70' pylon 40' base section w/ 5 buried in top section of tower
Scan14
Scan15
Scan16
Scan17
Second half of pylon
Scan18
Scan19
Scan20
Assembly of Shively 6-bay FM. To be installation 70' pylon
Scan21
Scan22
Scan23
Scan24
FM antenna installation
Scan25
Scan26
Scan27
Scan28
Scan01
Scan02
Scan03
Scan04
Scan05
Scan06
Scan07
Scan08

St. Louis
New Base

New tower stub 80'
beside new base

Typical ground screen
installation

WQED
Pittsburgh, Pa.
West face of tower
(4-bay FM, 8 elements

FM panel

FM panel install
(Shively FM)

FM panel install
(Shively FM)

FM panel mount
Just below t-bar
on all 3 faces

FM panel
(Shively)

WPGH, TV 53
Pittsburgh, Pa.
Removal of 3000 lb. pedestal

Removal of 3000 lb. pedestal (pic#2)

Removal of 3000 lb. pedestal (pic#3)

Removal of a G-7 section, 650' above ground

Dismantle section for shipment to Florida

Dismantle section for shipment to Florida (pic#2)

Dismantle section for shipment to Florida (pic#3)

Four levels of guy wires

Four levels of guy wires (pic#2)

500 Ft. level

G-10 section in left, G-7 on right

Telluride, Colorado
Proposed KRYD site
(Note that there is no road access)

Supplies must be brought in by helicopter
(Chopper1)
(Chopper2)
(Chopper3)
(Chopper4)

Construction of base at site
(Base1)
(Base2)
(Base3)
(Base4)
(Base5)
(Base6)
 

WATM-TV, Channel 23,
Altoona, Pa.
 

Erection of 280' Path Product Tower
Cellular One, Westmont, Pa.
 

AM Tower insulator replacement
Salem Communication,
San Antonio, Texas
 

Foundation, 240' Pirod Tower
WBRF-FM
Fisher Peak, N.C.
 

Fisher Peak Tower
 

6" transmission line burn-out
(vandalism / shot line)
WMDT - TV 47
 

Cleaning of 8" transmission line
WTTE, Ch. 28
Columbus, Ohio
 

Slot Cover Replacement
WTTO, Ch. 21
Birmingham, Alabama
 

Meteorological Instrument
Elevator Installations
 

 Fisher Peak Erection
 

180 SSV Rohn Tower
Cellular One, W.V.
Click to send email: edmistontowerinc.com